Evolution 38s & 38i
Designed to give superior stability & a smooth weather ride. An ideal, practical boat for commercial, diving, angling and survey work.
In 2003 the Evolution 38 was introduced onto the market and after 4 years, the Evolution 38 has proved itself to be a good, solid and safe working platform withstanding all conditions the English weather can throw at it.
Most of the Evolution 38s' built have a commercial use, angling & dive charter
with a top speed of 27 knots and a cruising speed of 18 knots.
The Evolution 38 has a deep 'V' tri-hedral hull design & a 45° bow for a smoother ride that handles exceptionally well in all weathers.
A Nidaplas deck & wheelhouse bulkhead can be used instead of
¾"
marine ply to make the boat lighter and even more economical.
Full-length keel with skeg and rudder protecting prop.
Prop tunnel for shaft angle reduction.
There is a toilet on-deck option and flush engine hatch or engine box option available too.
A shortened wheelhouse version can be made giving even more deck space if required.
Evolution 38i
The 1st Evolution 38i was introduced in 2006 - this version of the Evolution 38 features a newly styled gunwale that was designed to cater for Icelandic clients.
Dimensions:
| Length | 11.3 metres | 37.07 ft |
| Beam | 3.6 metres | 11.81 ft |
| Depth | 0.902 metres | 2.96 ft |
| Water line length | 9 metres | 29.53ft |
| Deck area | 16.75 sq metres | 180.23 sq ft |
| Displacement | 5500 kg | |
| Fuel capacity | 300 gallons | 1135.59 litres |
Evolution 38 packages available:
Both versions of the Evolution 38 can be purchased in one of 3 stages:
Minimum construction - Hull & Super-structure
Structure complete and weather sealed
Complete - ready to sail away!
An Evolution 38 Stage 1 Kit consists of:
Hull, Gunwale and wheelhouse joined, pasted and bonded. Bulkhead and longitudinal structure ribs constructed and bonded in vessel.
Stage 1 Kit Prices £20,000 + VAT
We are also offering an alternative to marine ply at no extra cost, Nidaplas structural bulkheads and for the 2nd & 3rd stages the deck. This is a much lighter material giving better fuel efficiency.
Please contact us for prices and further details - our telephone, fax, e-mail and postal address details can be found on the Contact Us page.

Copyright © 2007-2008 Universal Projects Ltd. All Rights Reserved.